SNI 7

KUBIKASI BETON MATERIAL DALAM KG


MUTU (m3) SEMEN
K225 1 371
K-225 6.98 2589.58

MUTU VOLUME SEMEN (ZAK)

k-225 6.98 51.8

SEMEN (ZAK)
KONVERSI KOMPOSISI MATERIAL DALAM 1 ZAK SEMEN 1
DOLAK 20CM X 35CM X 50CM = 0.035 M3 1 DOLAK

0.035 1 DOLAK
Diketahui :
Diameter Atas 0.25 Jari " Atas (R) = 0.125
Diameter Bawah 0.2 Jari " Bawah (r) = 0.1
Tinggi Core (t) = 0.22

Volume Core 0.0088

Luas Area 1 (R) 0.04908738521


Luas Area 2 (r) 0.03141592654
Rumus Alternatif Larea 1 + Larea 2 * t
2
Volume Core Rumus Alternatif 0.0089

Jumlah Komposisi Beton K-225 dengan concrete 0.009 m3


Semen
Pasir
Kerikil
Air
SNI 7394-2008
MATERIAL DALAM KG BERAT JUMLAH AIR PERSEN AIR W/C Rasio
PASIR KERIKIL SEMEN+PASIR+KERIKIL (LITER)
698 1047 2116 215 10.16% 0.58
4872.04 7308.06 14769.68 1500.70 10.16% 0.58

PASIR (M3 ) KERIKIL (M3 ) JUMLAH AIR


(LITER)
3.48 5.41 1500.7

PASIR (M3/ZAK) KERIKIL (M3/ZAK) AIR (LITER)


0.067 0.105 29.0
2 DOLAK 3 DOLAK

1.920 2.986

Semen Pasir Kerikil


0.5 m3 185.5 349 523.5
1 Ember (0.0087m3) 3.2 6.1 9.1

Semen Pasir Kerikil


1 molen= 50.09 94.23 141.35
ember=

3.71 0.249 0.291


426.44 28.65 33.43
ember= 106.609 7.163 8.357

1.018 5.40
4.072
m3

1 + Larea 2 * t

m3
BERAT CONCRETE
(MATERIAL+AIR dlm KG)
2331
16270.38

Air
107.5
1.9

Air
29.03 kg

107.5
1235.63
KUBIKASI BETON
MUTU (m3)
K-250 1
K-250 1 BORPILE 1.02
K-250 4 BORPILE 4.08

MUTU VOLUME

K-250 1 BORPILE 1.02


K-250 4 BORPILE 4.08

KONVERSI KOMPOSISI MATERIAL DALAM 1 ZAK SEMEN


DOLAK 15CM X 40CM X 55CM = 0.035 M3

0.0330
Diketahui :
Diameter Atas 0.25 Jari " Atas (R) =
Diameter Bawah 0.2 Jari " Bawah (r) =
Tinggi Core (t) =

Volume Core

Luas Area 1 (R)


Luas Area 2 (r)
Rumus Alternatif

Volume Core Rumus Alternatif

Jumlah Komposisi Beton K-225 dengan concrete 0.009 m3


Semen
Pasir
Kerikil
Air
SNI 7394-2008
BERAT
MATERIAL DALAM KG SEMEN+PASIR+KERI JUMLAH AIR PERSEN AIR
SEMEN PASIR KERIKIL KIL (LITER)
384 692 1039 2115 215.0 10.17%
391.68 705.84 1059.78 2157.30 219.30 10.17%
1566.72 2823.36 4239.12 8629.20 877.20 10.17%

SEMEN (ZAK) PASIR (M3 ) KERIKIL (M3 ) JUMLAH AIR


(LITER)
7.8 0.504 0.785 219.3
31.3 2.0 3.1 877.2

SEMEN (ZAK) PASIR (M3/ZAK) KERIKIL (M3/ZAK) AIR (LITER)


1 0.064 0.100 28.0
1 DOLAK 2 DOLAK 3 DOLAK

1 DOLAK 1.950 3.037

Semen Pasir
0.5 m3 185.5 349
1 Ember (0.0087m3) 3.2 6.1

Semen Pasir
1 molen= 50.09 94.23
ember=

3.71 0.249
426.44 28.65
ember= 106.609 7.163
1.018 5.40
4.072
0.125
0.1
0.22

0.0088 m3

0.04908738521
0.03141592654
Larea 1 + Larea 2 * t
2
0.0089 m3
BERAT CONCRETE
W/C Rasio
(MATERIAL+AIR dlm KG)
0.56 2330
0.56 2376.6
0.56 9506.4

Kerikil Air
523.5 107.5
9.1 1.9

Kerikil Air
141.35 29.03 kg

0.291 107.5
33.43 1235.63
8.357
SNI 7394-2
KUBIKASI BETON MATERIAL DALAM KG
MUTU (m3) SEMEN PASIR KERIKIL
Standard 1m3 K300 1.000 413 681 1021
K-300 154 63,602.00 104,874.00 157,234.00

Input disini mau brp m3

1.018 5.40
4.072
Diketahui :
Diameter Atas 0.25 Jari " Atas (R) = 0.125
Diameter Bawah 0.2 Jari " Bawah (r) = 0.1
Tinggi Core (t) = 0.22

Volume Core 0.0088 m3

Luas Area 1 (R) 0.0490873852


Luas Area 2 (r) 0.0314159265
Rumus Alternatif Larea 1 + Larea 2 * t
2
Volume Core Rumus Alt 0.0089 m3

Jumlah Komposisi Beton K-225 dengan concrete 0.009 m3


Semen
Pasir
Kerikil
Air
SNI 7394-2008
BERAT JUMLAH AIR PERSEN AIR W/C Rasio
SEMEN+PASIR+KERIKIL (LITER)
2115 216 10.21% 0.52
325,710.00 33,264.00 10.21% 0.58

Semen Pasir Kerikil


0.5 m3 185.5 349 523.5
1 Ember (0.0087m3) 3.2 6.1 9.1

Semen Pasir Kerikil


1 molen= 50.09 94.23 141.35
ember=

3.71 0.249 0.291


426.44 28.65 33.43
ember= 106.609 7.163 8.357
BERAT CONCRETE
(MATERIAL+AIR dlm KG)
2331
358974
154.000

Air
107.5
1.9

Air
29.03 kg

107.5
1235.63