I. PEKERJAAN PERSIAPAN
1 Pengukuran /pas. bowplank 80.00 m' -
2 Galian pondasi 98.91 m3 -
3 Urugan kembali pondasi 24.73 m3 -
sub total Rp -
II. PEKERJAAN PASANGAN
REKAPITULASI AKHIR
I. PEKERJAAN PERSIAPAN ....................................................................... Rp.
II. PEKERJAAN PASANGAN ....................................................................... Rp.
III. PEKERJAAN LANTAI, ATAP DAN PLAFOND ....................................................................... Rp.
IV. PEKERJAAN PENGECETAN ....................................................................... Rp.
V. PEKERJAAN PENGGANTUNG ....................................................................... Rp.
VI. PEKERJAAN SANITASI ....................................................................... Rp.
VII. PEKERJAAN INSTALASI LISTRIK ....................................................................... Rp.
LOKASI 0
I B A H A N :
1 P a s i r Pasang m3 Rp. 6,476,400.00
2 Pasir Beton m3 Rp. 6,476,400.00
3 Pasir Urugan Biasa m3 Rp. 1,354,200.00
4 Kerikil / Cor Beton m3 Rp. 1,406,900.00
5 Batu Kali m3 Rp. 3,193,700.00
7 Batu Pecah 2/3 m3 Rp. 4,025,300.00
13 Batu Tela ( Bataco) bh Rp. 35,200.00
14 Semen(50 kg) kg Rp. 23,400.00
zak Rp. 1,170,000.00
15 Semen Warna (50 kg) kg Rp. 25,400.00
zak Rp. 1,016,000.00
21 Kayu Klas I 10/10, 5/10,5/5,2/2, m3 Rp. 6,500,000.00
22 Kayu Klas II 5/10,5/5, m3 Rp. 6,000,000.00
23 Kayu Klas III (Perancah/Begisting) m3 Rp. 5,000,000.00
24 Kayu Lat 1/3 cm ( Kayu besi ) btg Rp. 70,000.00
25 Kayu Lat 1/3 cm ( Kayu matoa ) btg Rp. 60,000.00
26 Kayu buah patok btg Rp. 50,000.00
29 Paku Campur kg Rp. 54,600.00
30 Paku Seng/ardek kg Rp. 89,600.00
31 Paku Tripleks/teakwood kg Rp. 60,600.00
32 Baut 12 bh Rp. 32,639.20
33 Angker 12 mm bh Rp. 51,251.00
34 Begel Kalung bh Rp. 170,200.00
35 Kawat ikat beton kg Rp. 54,800.00
36 Besi Beton dial 10 mm btg Rp. 330,044.23
37 Besi beton dial 12 mm btg Rp. 398,897.36
38 Pipa PVC 2'' ----4 mtr btg Rp. 238,075.00
DAFTAR HARGA BAHAN DAN UPAH
LOKASI 0
LOKASI 0
4 Pemasangan 1 m2 acian
HARGA JUMLAH
NO URAIAN SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
Pekerja HO 0.2000 162,500.00 32,500.00
Tukang Batu HO 0.1000 244,400.00 24,440.00
Kepala Tukang HO 0.0100 317,200.00 3,172.00
Mandor HO 0.0100 326,300.00 3,263.00
JUMLAH TENAGA KERJA 63,375.00
B. BAHAN
Semen Kg 3.2500 23,400.00 76,050.00
D PEKERJAAN PENGECATAN
1 1 m2 Mengecat Kusen Pintu Dan Jendela (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
HARGA JUMLAH
NO URAIAN SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
Pekerja HO 0.0700 146,620.00 10,263.40
Tukang Cat HO 0.0090 204,930.00 1,844.37
Kepala Tukang HO 0.0060 265,650.00 1,593.90
Mandor HO 0.0030 273,240.00 819.72
JUMLAH TENAGA KERJA 14,521.39
B. BAHAN
Cat Meni Kg 0.2000 101,676.16 20,335.23
Plamur Kg 0.1500 78,100.00 11,715.00
Cat dasar Kg 0.17 138,550.00 23,553.50
Cat penutup Kg 0.26 138,550.00 36,023.00
Pengencer Kg 0.03 79,401.16 2,382.03
Amplas lbr 0.2 10,000.00 2,000.00
JUMLAH HARGA BAHAN 96,008.77
C. PERALATAN
Alat Bantu Ls 1.0000 1,000.00 1,000.00
3 1 M2 Mengecat Plafon
HARGA JUMLAH
NO URAIAN SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
Pekerja HO 0.0880 146,620.00 12,902.56
Tukang Cat HO 0.1100 204,930.00 22,542.30
Kepala Tukang HO 0.0011 265,650.00 292.22
Mandor HO 0.0030 273,240.00 819.72
JUMLAH TENAGA KERJA 36,556.80
B. BAHAN
Cat Plafon Kg 0.5500 27,710.0000 15,240.5000
Plamur Kg 0.1000 78,100.0000 7,810.0000
Amplas lbr 0.3000 10,000.00 3,000.0000
JUMLAH HARGA BAHAN 26,050.50
C. PERALATAN
Alat Bantu Ls 1.0000 1,000.00 1,000.00
Jadi untuk
Harga 1 (Satu Betong Bertulang)
A+B+C+D+E+F A 1,082,708.00
B 12,489,914.00
C 5,015,662.86
D 2,567,925.00
E 2,163,800.00
F 1,330,604.00
Jumlah ( A+B+C+D+E+F) 24,650,613.86
Overhead & Profit 10 % x D 2,465,061.39
Harga Satuan Pekerjaan ( A+B+C+D+E+F) + Oferhead & Profit 27,115,675.24
G PEKERJAAN INSTALASI LISTRIK
1 Pasang Lampu TL 1 X 40 Watt
HARGA JUMLAH
NO URAIAN SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
Pekerja HO 1.0000 146,620.00 146,620.00
Tukang HO 0.5000 204,930.00 102,465.00
Kepala Tukang HO 0.2500 265,650.00 66,412.50
Mandor HO 0.0330 273,240.00 9,016.92
JUMLAH TENAGA KERJA 324,514.42
B. BAHAN
Lampu Bh 1.0000 191,575.58 191,575.58
Kabel Kbl 10.0000 22,580.05 225,800.46
Pittingg Bh 1.0000 136,401.16 136,401.16
I. PEKERJAAN PERSIAPAN
1 Pengukuran /pas. bowplank 80.00 m' 156,844.05 12,547,524.00
2 Galian pondasi 98.91 m3 144,135.75 14,256,567.93
3 Urugan kembali pondasi 24.73 m3 108,421.50 2,681,011.62
sub total Rp 29,485,103.54
II. PEKERJAAN PASANGAN
REKAPITULASI AKHIR
I. PEKERJAAN PERSIAPAN ....................................................................... Rp. 29,485,103.54
II. PEKERJAAN PASANGAN ....................................................................... Rp. 513,443,350.34
III. PEKERJAAN LANTAI, ATAP DAN PLAFOND ....................................................................... Rp. 667,657,075.63
IV. PEKERJAAN PENGECETAN ....................................................................... Rp. 54,066,617.56
V. PEKERJAAN PENGGANTUNG ....................................................................... Rp. 12,419,908.45
VI. PEKERJAAN SANITASI ....................................................................... Rp. 47,689,556.26
VII. PEKERJAAN INSTALASI LISTRIK ....................................................................... Rp. 21,716,591.53
m2 tebal vol
6 cor lantai 195.000 0.350 68.250 m3
8 lantai keramik
kaca 16.810 m2
vol sat
7 atap seng 498.323 m2
Type 1 5
1.89 Kaca 0.45 1.44
519
2.796
7.2
11.33