TABEL PERHITUNGAN BERAT BESI PADA BETON BERTULANG

Pondasi Telapak 60x60x15


TABEL PERHITUNGAN BERAT BESI/M3
Jumlh Plat/ pjg Besi/m3 Total Berat
Panjang Lebar Tebal jarak tul. Jml tul. Hak Panjang Besi/ sengkang Pjg Besi/ plat Berat Besi/ m
NO ITEM PEKERJAAN Selimut Beton M3 Besi
(m) (m) (m) (m) (m/bh) (m) (m) (m/bh) (m/kg)
(bh/m3) (m/m3) (kg)
1 2 3 3 3 3 4 5 7 8 8 9 9 10 11
Rumus a b c d e=(1/(a*b*c)) f g=((a-2d)/f)+1 h i=(2*((a-2d)+(c-2d)))+2h j=g*i k=e*j l m=k*l

TULANGAN x Ø 10 mm 0,600 0,600 0,150 0,025 18,519 0,120 5,583 0,050 1,400 7,817 144,753 0,617 89,240

Rumus a b c d e=(1/(a*b*c)) f g=((b-2d)/f)+1 h i=(2*((b-2d)+(c-2d)))+2h j=g*i k=e*j l m=k*l

TULANGAN y Ø 10 mm 0,600 0,600 0,150 0,025 18,519 0,120 5,583 0,050 1,400 7,817 144,753 0,617 89,240
BERAT BESI TOTAL 178,481

SLOOF 15/20
TABEL PERHITUNGAN BERAT BESI/M3
Luas Jumlah Pjg Besi/m3 pjg Besi/m3 Total Berat
Panjang Lebar Selimut Beton Panjang/ M3 Jarak Sengkang Jmlh Sngkng/M3 Hak Panjang Besi/ Sengkang Berat Besi/ m
NO ITEM PEKERJAAN Penampang Tulangan (Tul. Pokok) (Tul. Sgkng) Besi
(m) (m) (m) (m) (m) (bh) (m) (m) (kg)
(m2) (bh) (m) (m) (kg)
1 2 3 3 3 3 4 5 6 7 8 8 9 9 10 11
Rumus a b c d=(a*b) e=(1/d) f h i=(e/h) j k=((a-2c+b-2c)*2)+2j l=((e+2j)*f) m=(i*k) n o=(m*n)

TULANGAN UTAMA Ø 10 mm 0,200 0,150 0,030 0,030 33,333 5,000 0,050 167,167 0,617 103,058
TULANGAN BEHEL Ø 8 mm 0,150 222,222 0,560 124,444 0,395 49,101
BERAT BESI TOTAL 152,159

KOLOM Praktis 10/10


TABEL PERHITUNGAN BERAT BESI/M3
Luas Jumlah Pjg Besi/m3 pjg Besi/m3 Total Berat
Panjang Lebar Selimut Beton Panjang/ M3 Jarak Sengkang Jmlh Sngkng/M3 Hak Panjang Besi/ Sengkang Berat Besi/ m
NO ITEM PEKERJAAN Penampang Tulangan (Tul. Pokok) (Tul. Sgkng) Besi
(m) (m) (m) (m) (m) (bh) (m) (m) (kg)
(m2) (bh) (m) (m) (kg)
1 2 3 3 3 3 4 5 6 7 8 8 9 9 10 11
Rumus a b c d=(a*b) e=(1/d) f h i=(e/h) j k=((a-2c+b-2c)*2)+2j l=((e+2j)*f) m=(i*k) n o=(m*n)

TULANGAN UTAMA Ø 10 mm 0,100 0,100 0,015 0,010 100,000 4,000 0,050 400,400 0,617 246,847
TULANGAN BEHEL Ø 8 mm 0,150 666,667 0,380 253,333 0,395 99,955
BERAT BESI TOTAL 346,802

KOLOM 17/17
TABEL PERHITUNGAN BERAT BESI/M3
Luas Jumlah Pjg Besi/m3 pjg Besi/m3 Total Berat
Panjang Lebar Selimut Beton Panjang/ M3 Jarak Sengkang Jmlh Sngkng/M3 Hak Panjang Besi/ Sengkang Berat Besi/ m
NO ITEM PEKERJAAN Penampang Tulangan (Tul. Pokok) (Tul. Sgkng) Besi
(m) (m) (m) (m) (m) (bh) (m) (m) (kg)
(m2) (bh) (m) (m) (kg)
1 2 3 3 3 3 4 5 6 7 8 8 9 9 10 11
Rumus a b c d=(a*b) e=(1/d) f h i=(e/h) j k=((a-2c+b-2c)*2)+2j l=((e+2j)*f) m=(i*k) n o=(m*n)

TULANGAN UTAMA Ø 10 mm 0,170 0,170 0,030 0,029 34,602 4,000 0,050 138,808 0,617 85,575
TULANGAN BEHEL Ø 8 mm 0,150 230,681 0,540 124,567 0,395 49,149
BERAT BESI TOTAL 134,725

BALOK LATEY 11/15


TABEL PERHITUNGAN BERAT BESI/M3
Luas Jumlah Pjg Besi/m3 pjg Besi/m3
Panjang Lebar Selimut Beton Panjang/ M3 Jarak Sengkang Jmlh Sngkng/M3 Hak Panjang Besi/ Sengkang Berat Besi/ m Total Berat
NO ITEM PEKERJAAN Penampang Tulangan (Tul. Pokok) (Tul. Sgkng)
(m) (m) (m) (m) (m) (bh) (m) (m) (kg) Besi
(m2) (bh) (m) (m)
(kg)
1 2 3 3 3 3 4 5 6 7 8 8 9 9 10 11
Rumus a b c d=(a*b) e=(1/d) f h i=(e/h) j k=((a-2c+b-2c)*2)+2j l=((e+2j)*f) m=(i*k) n o=(m*n)

TULANGAN UTAMA Ø 8 mm 0,150 0,110 0,020 0,017 60,606 4,000 0,050 242,824 0,395 95,809
TULANGAN BEHEL Ø 6 mm 0,150 404,040 0,460 185,859 0,222 41,249
BERAT BESI TOTAL 137,058

RING BALOK 15/20


TABEL PERHITUNGAN BERAT BESI/M3
Luas Jumlah Pjg Besi/m3 pjg Besi/m3
Panjang Lebar Selimut Beton Panjang/ M3 Jarak Sengkang Jmlh Sngkng/M3 Hak Panjang Besi/ Sengkang Berat Besi/ m Total Berat
NO ITEM PEKERJAAN Penampang Tulangan (Tul. Pokok) (Tul. Sgkng)
(m) (m) (m) (m) (m) (bh) (m) (m) (kg) Besi
(m2) (bh) (m) (m)
(kg)
1 2 3 3 3 3 4 5 6 7 8 8 9 9 10 11
Rumus a b c d=(a*b) e=(1/d) f h i=(e/h) j k=((a-2c+b-2c)*2)+2j l=((e+2j)*f) m=(i*k) n o=(m*n)

TULANGAN UTAMA Ø 10mm 0,200 0,150 0,030 0,030 33,333 4,000 0,050 133,733 0,617 82,447
TULANGAN BEHEL Ø 8 mm 0,150 222,222 0,560 124,444 0,395 49,101
BERAT BESI TOTAL 131,547
ANALISA HARGA SATUAN ADDENDUM

I M3 KOLOM 17X17 BETON BERTULANG


BAHAN KOEFISIEN SATUAN HARGA SATUAN JUMLAH HARGA
Kayu Mal (Papan) 0,240 M3 2.100.000,00 504.000,00
Paku Biasa 4,000 KG 28.500,00 114.000,00
Minyak Bekisting 2,000 LTR 7.500,00 15.000,00
Besi Beton Polos 134,725 KG 16.616,00 2.238.584,99
Kawat Beton 3,000 KG 33.000,00 99.000,00
PC 228,000 KG 1.770,00 403.560,00
Pasir Pasang 0,520 M3 500.000,00 260.000,00
Split 1/2 0,780 M3 675.000,00 526.500,00
Kayu Balok 0,150 M3 3.720.000,00 558.000,00
Plywood 3,500 LBR 75.000,00 262.500,00
Dolken Kayu 4,000 BTG 60.000,00 240.000,00
Pekerja 7,300 OH 110.000,00 803.000,00
Tukang Batu 0,350 OH 125.000,00 43.750,00
Tukang Kayu 3,300 OH 125.000,00 412.500,00
Tukang Besi 1,400 OH 125.000,00 175.000,00
Kepala Tukang 0,570 OH 150.000,00 85.500,00
Mandor 0,250 OH 110.000,00 27.500,00
JUMLAH 6.768.394,99
OVH 15% 1.015.259,25
JUMLAH TOTAL 7.783.654,24

I M3 SLOOF 15X20 BETON BERTULANG


BAHAN KOEFISIEN SATUAN HARGA SATUAN JUMLAH HARGA
Kayu Mal (Papan) 0,270 M3 2.100.000,00 567.000,00
Paku Biasa 2,000 KG 28.500,00 57.000,00
Minyak Bekisting 0,600 LTR 7.500,00 4.500,00
Besi Beton Polos 152,159 KG 16.616,00 2.528.274,77
Kawat Beton 3,000 KG 33.000,00 99.000,00
PC 228,000 KG 1.770,00 403.560,00
Pasir Pasang 0,520 M3 500.000,00 260.000,00
Split 1/2 0,780 M3 675.000,00 526.500,00
Pekerja 4,850 OH 110.000,00 533.500,00
Tukang Batu 0,350 OH 125.000,00 43.750,00
Tukang Kayu 1,560 OH 125.000,00 195.000,00
Tukang Besi 1,400 OH 125.000,00 175.000,00
Kepala Tukang 0,331 OH 150.000,00 49.650,00
Mandor 0,170 OH 110.000,00 18.700,00
JUMLAH 5.461.434,77
OVH 15% 819.215,22
JUMLAH TOTAL 6.280.649,99
I M3 RING BALOK 15X20 BETON BERTULANG
BAHAN KOEFISIEN SATUAN HARGA SATUAN JUMLAH HARGA
Kayu Mal (Papan) 0,240 M3 2.100.000,00 504.000,00
Paku Biasa 3,200 KG 28.500,00 91.200,00
Minyak Bekisting 1,600 LTR 7.500,00 12.000,00
Besi Beton Polos 131,547 KG 16.616,00 2.185.791,60
Kawat Beton 2,250 KG 33.000,00 74.250,00
PC 228,000 KG 1.770,00 403.560,00
Pasir Pasang 0,520 M3 500.000,00 260.000,00
Split 1/2 0,780 M3 675.000,00 526.500,00
Kayu Balok 0,160 M3 3.720.000,00 595.200,00
Plywood 2,800 LBR 75.000,00 210.000,00
Dolken Kayu 5,000 BTG 60.000,00 300.000,00
Pekerja 5,600 OH 110.000,00 616.000,00
Tukang Batu 0,350 OH 125.000,00 43.750,00
Tukang Kayu 2,640 OH 125.000,00 330.000,00
Tukang Besi 1,050 OH 125.000,00 131.250,00
Kepala Tukang 0,400 OH 150.000,00 60.000,00
Mandor 0,193 OH 110.000,00 21.230,00
JUMLAH 6.364.731,60
OVH 15% 954.709,74
JUMLAH TOTAL 7.319.441,34

I M3 PONDASI TELAPAK BETON BERTULANG


BAHAN KOEFISIEN SATUAN HARGA SATUAN JUMLAH HARGA
Kayu Mal (Papan) 0,083 M3 2.100.000,00 174.300,00
Paku Biasa 0,250 KG 28.500,00 7.125,00
Minyak Bekisting 0,250 LTR 7.500,00 1.875,00
Besi Beton Polos 178,481 KG 16.616,00 2.965.632,91
Kawat Beton 3,000 KG 33.000,00 99.000,00
PC 228,000 KG 1.770,00 403.560,00
Pasir Pasang 0,520 M3 500.000,00 260.000,00
Split 1/2 0,780 M3 675.000,00 526.500,00
Pekerja 4,850 OH 110.000,00 533.500,00
Tukang Batu 0,350 OH 125.000,00 43.750,00
Tukang Kayu 1,560 OH 125.000,00 195.000,00
Tukang Besi 1,400 OH 125.000,00 175.000,00
Kepala Tukang 0,331 OH 150.000,00 49.650,00
Mandor 0,170 OH 110.000,00 18.700,00
JUMLAH 5.453.592,91
OVH 15% 818.038,94
JUMLAH TOTAL 6.271.631,85
I M3 KOLOM PRAKTIS BETON BERTULANG
BAHAN KOEFISIEN SATUAN HARGA SATUAN JUMLAH HARGA
Kayu Mal (Papan) 0,400 M3 2.100.000,00 840.000,00
Paku Biasa 4,000 KG 28.500,00 114.000,00
Minyak Bekisting 2,000 LTR 7.500,00 15.000,00
Besi Beton Polos 346,802 KG 16.616,00 5.762.458,71
Kawat Beton 3,000 KG 33.000,00 99.000,00
PC 228,000 KG 1.770,00 403.560,00
Pasir Pasang 0,520 M3 500.000,00 260.000,00
Split 1/2 0,780 M3 675.000,00 526.500,00
Kayu Balok 0,150 M3 3.720.000,00 558.000,00
Plywood 3,500 LBR 75.000,00 262.500,00
Dolken Kayu 5,000 BTG 60.000,00 300.000,00
Pekerja 7,300 OH 110.000,00 803.000,00
Tukang Batu 0,350 OH 125.000,00 43.750,00
Tukang Kayu 3,300 OH 125.000,00 412.500,00
Tukang Besi 1,400 OH 125.000,00 175.000,00
Kepala Tukang 0,570 OH 150.000,00 85.500,00
Mandor 0,250 OH 110.000,00 27.500,00
JUMLAH 10.688.268,71
OVH 15% 1.603.240,31
JUMLAH TOTAL 12.291.509,02

I M3 BALOK LATEY BETON BERTULANG


BAHAN KOEFISIEN SATUAN HARGA SATUAN JUMLAH HARGA
Kayu Mal (Papan) 0,240 M3 2.100.000,00 504.000,00
Paku Biasa 3,200 KG 28.500,00 91.200,00
Minyak Bekisting 1,600 LTR 7.500,00 12.000,00
Besi Beton Polos 137,058 KG 16.616,00 2.277.358,85
Kawat Beton 2,250 KG 33.000,00 74.250,00
PC 228,000 KG 1.770,00 403.560,00
Pasir Pasang 0,520 M3 500.000,00 260.000,00
Split 1/2 0,780 M3 675.000,00 526.500,00
Kayu Balok 0,160 M3 3.720.000,00 595.200,00
Plywood 2,800 LBR 75.000,00 210.000,00
Dolken Kayu 5,000 BTG 60.000,00 300.000,00
Pekerja 5,600 OH 110.000,00 616.000,00
Tukang Batu 0,350 OH 125.000,00 43.750,00
Tukang Kayu 2,640 OH 125.000,00 330.000,00
Tukang Besi 1,050 OH 125.000,00 131.250,00
Kepala Tukang 0,400 OH 150.000,00 60.000,00
Mandor 0,193 OH 110.000,00 21.230,00
JUMLAH 6.456.298,85
OVH 15% 968.444,83
JUMLAH TOTAL 7.424.743,67
1M2 RANGKA PLAFOND

BAHAN KOEFISIEN SATUAN HARGA SATUAN JUMLAH HARGA


Kayu kls III 0,014 M3 2.100.000,00 29.400,00
Paku Biasa 0,060 KG 28.500,00 1.710,00
Pekerja 0,250 OH 110.000,00 27.500,00
Tukang Kayu 0,300 OH 125.000,00 37.500,00
Kepala Tukang 0,025 OH 150.000,00 3.750,00
Mandor 0,013 OH 110.000,00 1.375,00
JUMLAH 101.235,00
OVH 15% 15.185,25
JUMLAH TOTAL 116.420,25
1M2 JALUSI

BAHAN KOEFISIEN SATUAN HARGA SATUAN JUMLAH HARGA


Kayu kls III 0,020 M3 2.100.000,00 42.000,00
Pekerja 0,150 OH 110.000,00 16.500,00
Tukang Kayu 0,250 OH 125.000,00 31.250,00
Kepala Tukang 0,045 OH 150.000,00 6.750,00
Mandor 0,075 OH 110.000,00 8.250,00
JUMLAH 104.750,00
OVH 15% 15.712,50
JUMLAH TOTAL 120.462,50