A. LABOR
TOTAL A 1,202.11
B. EQUIPMENT
TOTAL B 708.21
C. TOTAL (A + B) 1,910.32
D. OUTPUT ( Ea./Hr. ) 3.00
E. UNIT COST ( C ÷ D ) 636.77
F. MATERIALS
Tarpaulin 900.00
5.76 m² 5,184.00
CM10.005 Apitong 20.00 bd.ft 47.00 940.00
Incidentals (15% of the above) 918.60
TOTAL F 7,042.60
A. LABOR
TOTAL A 1,102,585.28
B. EQUIPMENT
B. EQUIPMENT
TOTAL B 7,691,783.88
C. TOTAL (A + B) 8,794,369.16
D. OUTPUT ( Ea./Hr. ) 1.00
E. UNIT COST ( C ÷ D ) 8,794,369.16
F. MATERIALS
TOTAL F -
A. LABOR
TOTAL A 1,620,000.00
B. EQUIPMENT
TOTAL B -
C. TOTAL (A + B) 1,620,000.00
D. OUTPUT ( L.s. ) 1.00
E. UNIT COST ( C ÷ D ) 1,620,000.00
F. MATERIALS
TOTAL F 209,963.00
A. LABOR
TOTAL B 857,907.13
B. EQUIPMENT
TOTAL B -
C. TOTAL (A + B) 857,907.13
D. OUTPUT ( L.s.) 1.00
E. UNIT COST ( C ÷ D ) 857,907.13
F. MATERIALS
Road and Bridge Work Site Temporary Signages
Advance Warning Sign
Road work ahead (T1-1) 2 each 3,456.00 1.37 9,460.80
Bridge work ahead (T1-2) 2 each 3,456.00 1.37 9,460.80
Workmen Ahead (T1-5) 4 each 3,456.00 0.71 9,745.92
End Road Work (T2-26) 2 each 3,456.00 1.37 9,460.80
TOTAL F 38,128.32