Sie sind auf Seite 1von 2

BAB V

HUBUNGAN BALOK KOLOM

5.1 Data Kolom K1


Data :
b = 500 mm Pu = 2330 kN
h = 500 mm Mu = 280 kNm
fc’ = 25 MPa Vu = 210 kNm
fy = 390 MPa ΣP = 5830 kN
Es = 200000 MPa Lc = 4500 mm
β1 = 0,85 Lu = 4500 – 550 = 3950 mm
Φ = 0,9 As = 16 D22
= 6084,64 mm²

Data Balok B1
Data :
b = 350 mm Dia,tul = 22 mm
h = 550 mm As,1tul = 380,29 mm
fc’ = 25 MPa As = 9 D22
fy = 390 MPa = 3422,61 mm²
ds = 85 mm As’ = 4 D22
d’ = 60 mm = 1521,16 mm²
Lb = 7000 mm

Mpr, 1 = 662,375 kNm Mpr,2 = 332,253 kNm


Ts,1 = As × 1,25 fy Ts,2 = As’×1,25 fy
= 3422,61 × 1,25 × 390 = 1521,16 × 1,25 × 390
= 1668522,375 N = 741565,5 N
5.2 Tulangan HBK
(𝑀𝑝𝑟,1+𝑀𝑝𝑟,2)
V, Sway = 𝐿𝑢
(662,375+332,253)×1000000
= = 251804, 56 N
3950

Vu = Ts,1 + Ts,2 – V,Sway


= 1668522,375 + 741565,5 – 251804, 56 = 2158283,315 N
𝑉𝑢 2158283,315
Vn = = = 2398092,572 N
𝛷 0,9

Aj = 500 × 500 = 250000


Vj = 1,7 × √𝐹𝑐′ × Aj
= 1,7 × √25 × 250000 = 2125000 N
Vn > Vj = 2398092,572 > 2125000 TIDAK OK

𝑃𝑢 1
Vc = (1 + ) × (6 × √𝐹𝑐′) × b × d
14×𝐴𝑔𝑟𝑜𝑠𝑠
2330 1
= (1 + ) × (6 × √25) × 350 × 465
14×500×500

= 135715,2875 N
Vs = Vn – Vc
= 2398092,572 – 135715,2875 = 2262377,285 N
Sengkang : D 16 mm
As, 1tul = 201,14 mm²
Av = 4 As (= 4 Irisan)
= 4 × 201,14 = 804,56 mm²
𝐴𝑣×𝑓𝑦×𝑑
S = 𝑉𝑠
804,56×390×465
= = 64,493 mm
2262377,285

Dipakai = 4 D16 – 70

Das könnte Ihnen auch gefallen