PERHITUNGAN KONSTRUK BOILER COMBI SESUAI STANDAR JIS

A. DRUM
A.1. ASUMSI DATA SESUAI GAMBAR AWAL
MATERIAL SB 46
DIAMETER DALAM = 1200 MM
K = 0,4 , DARI TABEL STANDAR JIS TEMPERATURE DIBAWAH 480 DEG. C
PRESSURE = 1,25 MPa = 12,75 KG/CM2
Corrosion Allowance (a) = 1 mm
SB 46
a= = =11,5 kg/mm 2
4 4
ή = 0,8 di dapat dari RT baik
p−d 90−60
ή= = =0,33
p 90
ή Total = 0,8 x 0,33 = 0,27

Tebal plate Drum


P∗Di
t= +a
200∗a∗−2∗P ( 1−k )

12.75∗1200
t= +1
200∗11,5∗0,27−2∗12 ( 1−0,4 )

15300
t= +1
621−15,3
t=25,3+1=26,3 mm
(tebal nominal )

A.2. HASIL RIKSA UJI TANGGAL 21 -08-2020


Asumsi dilakukan pengujian Kekerasan dan Ketebalan
t pengukuran = 25,5 MM
HV = 150 kg/mm2
Hv 150
Maka SB = = =50 kg/mm 2
3 3
SB 50
a= = =12,5 kg /mm2
4 4

12,75∗1200
t= +1
200∗12,5∗0,27−2∗12,75 ( 1−0,4 )
15300
t= +1
675−15,3

t=23,2+1=24,2 mm
(Tebal hitung)
Kesimpulan t hitung < t actual
24,2 mm < 25,5 mm

B. DISHEAD
B.1 Asumsi Data Dari Drawing
P= 12,75 KG/CM2
MATERIAL SB 46 = 46 KG/MM2
SB 46
a= = =11,5 kg/mm 2
4 4
R = 1000 mm , r = 200 mm

P∗R∗W

w=0,25∗¿) = 0,25 * (3+ 1000 ) = 1,31
200
12,75∗1000∗1,31 16702,5
¿= +a ¿ +1 = +1=8,3 mm
200∗a−0,2 P 200∗11,5−0,2∗12,75 2297,5
Di dapat Tnominal=8.3 mm

B.2. Hasil Riksa Uji Tanggal 21-08-2020


Asumsi dilakukan uji kekerasan dan ketebalan
HV 150 SB 50
Hv = 150 kg/mm2 , SB = = =50 kg /mm 2a= = =12,5 kg /mm2
3 3 4 4

t actual = 8 mm
12,75∗1000∗1,31 16702,5
t hitung= +1 = +1 = 7,7 mm
200∗12,5−0,2∗12,75 2497,5

Kesimpulan :
t hitung < t actual
7,7 mm < 8 mm
ACC
C. PIPA WATERWALL
C.1. Asumsi Data sesuai gambar
ID pipe = 53 mm
P = 12,75 kg/cm2
Jarak antar pipa (a) = 90 mm
Material SB35 = 35kg/mm2
SB 35
a= = =8,75 kg /mm 2
4 4

P∗d 12,75∗53
t hitung= + 0,005∗d + a = + 0,005*53 + 1
200∗a+ P 200∗8,75+ 12,75
675,75
t hitung= +1,265 = 1,65 mm = t nominal
1762,75

C.2 Asumsi dilakukan Pengujian Kekerasan dan Ketebalan


HV= 135 kg/mm , SB = 135/3 = 45 kg/mm2, t riksa uji = 1,6 mm
SB 45
a= = =11,25 kg/mm 2
4 4

P∗d 12,75∗53
t hitung= + 0,005∗d + a = + 0,005*53 + 1
200∗a+ P 200∗11,25+12,75

675,75
t hitung= +1,265 = 1,56 mm
2262,75
Kesimpulan
T hitung < t actual
1,56 mm < 1,6 mm
ACC

D. PIPA API
D.1. Asumsi data sesuai gambar
P = 12,75 kg/cm2
d = 59 mm

P∗d 12,75∗63,5
¿= +1,5= +1,5=2,6 mm = t nominal
700 700

D.2. Asumsi dilakukan Uji kekerasan dan ketebalan


t riksa uji = 2,58

P∗d 12,75∗57
¿= +1,5= +1,5=2,52mm
700 700

T hitung < t actual


2,5 mm < 2,58 mm
ACC
E. TUBE PLATE
E.1. ASUMSI DATA SESUAI GAMBAR
Jarak antar pipa = 90 mm
d 63,5
t=5+ =5+ =11,35 mm (tebal plate nominal)
10 10

(
P= 1+
4,5
t ) (
∗d= 1+
4,5
11,35 )
∗63,5=88,67 mm (jarak antar pipa)