Concrete Slab Design Report
Date 22 May 2010, 20 May 2013
(C) Nathan Madutujuh, ESRC
PROJECT DATA:
Project : GREENWOODGOLF III No. 38
Location : MALANG
Building :
File : F:\coba job\PROGRAM BANTU\RUMAH TINGGAL 2 LANTAI.MDL
Date : 14\08\2021
Licensee : Hendi Dwi Irmawan, DSN JATIDOWO, DESA JATIDOWO, RT:003/RW:003, KEC. REJOTANGAN, KAB. TULUNGAGUNG
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Floor = 2, Beam Layout = 2, nr = 42
Two-Way Concrete Slab Design:
typ = 1, elset = 1, mat = 1, dsg = 1, tp = 12.00 cm
qdl = -492.00, qll = -72.00, qrd = 0.00, qrl = 0.00 kg/m2, fc1 = 249.00, fy = 2400.00 kg/cm2, db = 10.00 mm
Lx = 100.00 cm, Ly = 350.00 cm, rdf = 1.2000, rdf1 = 1.0000
ss2 = 0.9700, ax2 = 0.9880, ay2 = 0.0120, qu = -705.60 kg/m2
Mux = ss2 * ax2 * q * lx*lx / 24 = 2817.5784 kg.cm/m (mid-span) -> d10 - 240.000 mm
Muy = ss2 * ay2 * q * ly*ly / 24 = 419.2146 kg.cm/m (mid-span) -> d10 - 240.000 mm
Mux1 = -ax2 * q * lx*lx / 12 = 5809.4400 kg.cm/m (edge) -> d10 - 240.000 mm
Muy1 = -ay2 * q * ly*ly / 12 = 864.3600 kg.cm/m (edge) -> d10 - 240.000 mm
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //
Short=d10-200/200 //,Long=d10-200/200 //