TOWER SCHEDULE

PENANGANAN LONGSORAN T.56 SUTT 150 KV PLTU PACITAN - NEW PACITAN - NGUNTORONADI #1,2

Indication of legs PT PLN (Persero) PROJECT : PEKERJAAN PENANGANAN LONGSORAN T.56 SUTT 150 KV PLTU PACITAN - NEW PACITAN - NGUNTORONADI #1,2
WT = WEIGHT SPAN UNIT INDUK TRANSMISI SECTION : T. 53 s.d T.59
D C
WD = WIND SPAN JAWA BAGIAN TIMUR DAN BALI CONDUCTOR :

A B
DRAWING NO : REVISION NO : DATE :
RASIO WT/WD = 0.7 - 1.5
SPAN WILAYAH
PROGRESSIVE
TOWER ANGLES ACT. SPAN SPAN TENSION EQUIV. SPAN CONDITIION OF TOWER
NO TOWER TYPE INSULATOR DISTANCE WEIGHT WIND WT/WD CROSSING REMARKS KOORDINAT TAPAK TOWER
NUMBER LOCATION DESA / KELURAHAN KECAMATAN KABUPATEN
º ' " L/R (M) (M) (M) (M) (M) (M) X Y

1 T.53 Ext 4BB6 +0 DT 0.00 0.00 77.57 0.00 KEBUN BUNGUR TULAKAN PACITAN 531970.63 9097303.75
155.13 155.13 155.13 RUMAH, JALAN, TL20KV
2 T.54 Ext 4BB6 +9 11 18 5 R DT 155.13 844.00 272.32 3.10 KEBUN TULAKAN TULAKAN PACITAN 531817.22 9097280.71
389.50 389.50 389.50 RUMAH, JALAN
3 T.55A 4BB6 +15 4 11 56 R DT 544.63 172.70 301.27 0.57 KEBUN TULAKAN TULAKAN PACITAN 531427.42 9097299.30
213.04 213.04 213.04
5 T.56A 4BB6 +15 12 53 48 L DT 757.67 181.93 331.99 0.55 SAWAH TULAKAN TULAKAN PACITAN 531215.93 9097325.01
450.93 450.93 450.93 SALURAN, JALAN, SUNGAI
6 T.57A 4BB6 +15 18 5 9 L DT 1208.60 420.28 470.91 0.89 KEBUN TULAKAN TULAKAN PACITAN 530767.45 9097278.13
490.89 490.89 490.89 SUNGAI, RUMAH, JALAN
7 T.58A 4BB6 +15 5 34 1 R DT 1699.49 297.38 297.74 1.00 KEBUN TULAKAN TULAKAN PACITAN 530319.18 9097078.06
104.59 104.59 104.59 JALAN
7 T.58 Ext 4BB6 +12 10 51 2 R DT 1804.08 12.58 246.41 0.05 KEBUN LOSARI TULAKAN PACITAN 530219.93 9097044.88
388.22 388.22 388.22 RUMAH, JALAN
8 T.59 Ext 4BB6 +12 DT 2192.30 0.00 194.11 0.00 KEBUN TULAKAN TULAKAN PACITAN 529835.15 9096993.30