Beruflich Dokumente
Kultur Dokumente
Integrated Typical Floor Plan - Low Res
Integrated Typical Floor Plan - Low Res
50sq.
ft
. 2BHK-594.
50sq.
ft
.
TOI.
M.BEDRM. M.BEDRM.
4’
x7’
13’
7”x10’ TOI. 13’
7”x10’
4’
x7’
2BHK-576.
52sq.
ft
.
7’
8”x3’ LI
VING LI
VING 7’
8”x3’
10’
x16’
9” 10’
x16’
9”
TOI
. TOI
. 1BHK-409.
03sq.
ft
.
BEDRM. BEDRM.
6’
5”x4’ 6’
5”x4’
11’
4”x10’ 11’
4”x10’
BEDRM.
10’
x10’
6”
TOI
. 2BHK-564.
36sq.
ft
.
4’
x6’
5”
TOI
.
TOI.
3’
x7’
8” 3’
5”x4’ 7’
5”x4’
7’
x4’
SMOKE
CHECK
LOBBY TOI.
UP LI
VING 7’
x4’ BEDRM.
ALCOVE ALCOVE 10’
x15’
7” 10’
x10’
6”
LI
VING 7’1
0”x7’
10” 6’
11
”x8’
4”
UP
16’
7”x10’ M.BEDRM.
7’
5”X16’
10” 10’
3”x1’
1 3”
FIREMAN
EVACUATION LIFT LI
FT
6’
x3’
5” LIFT 6’
8”x6’
2” 10’
3”x6’
2”
LI
VING
6’
3”x6’
3” 10’
x16’
10”
10’
4”3’
x 5’
9”x2’
TOI.
6’
x3’
5” 7’
x4’
TOI.
6’
( 7
”)WI
DE 2.
00M.(6’
7”)WI
DE
ALCOVE 4’
x7’
PASSAGE PASSAGE
7’
3”x7’
10”
LI
VING ALCOVE
16’
7”x10’ 7’1
0”x7’
10”
TOI
.
4’
x6’
7”
LIFT LIFT SERVI
CELIFT LIFT
7’
5”x10’
10” 13’
x7’
4” 9’
4”x7’
4”
9’
5”x7’
4” 8’
4”x7’
4” TOI.
TOI. ALCOVE
7’
x4’ 3’
x7’
8” TOI
. 7’
x4’
6’
x1’
8” 7’
3”x7’
10”
4’
x6’
5” TOI.
TOI. 4’
x7’
4’
6”3’
x 3’
6”3’
x 7’
x4’
M.BEDRM. LI
VING
10’
x12’
9” 5’
9”2’
x
ALCOVE ALCOVE 10’
x16’
10” 10’
4”3’
x
7’1
0”x7’
10” 7’1
0”7’
x 1
0”
M.BEDRM. ALCOVE
3’
5”x6’ 3’
5”x6’ 9’1
0”x1’
1 6” 6’
9”x8’
2” LIVING
BEDRM. 9’
10”x12’
11
”
10’
x10’
6”
M.BEDRM.
BEDRM. 10’
3”x
11’
7”
BEDRM.
TOI
. TOI
.
11’
4”10’
x 11’
4”x10’ BEDRM.
6’
5”x4’ 6’
5”x4’ 10’
x10’
6”
LI
VING LI
VING
10’
x16’
9” 10’
x16’
9”
7’
8”x3’ 1BHK-419.
58sq.
ft
.
2BHK-576.
52sq.
ft
.
TOI. 2BHK-568.
12sq.
ft
.
4’
x7’ M.BEDRM.
M.BEDRM.
13’
7”10’
x TOI. 13’
7”10’
x
4’
x7’
2BHK-594.
50sq.
ft
. 2BHK-594.
50sq.
ft
. N