Sie sind auf Seite 1von 2

SAUDI ARAMCO ID/PIEU - 30-Nov-2017- REV. 2017.09.00 (Standards Cutoff - September 30, 2017) Rev. 2017.09.

00 30-Sep-17
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Storage, Handling & Preservation of Portable Fire Protection
SAIC-B-2012 30-Nov-17 MECH-
Equipment
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General Requirements
Portable (See Equipment
Fire Extinguishing Note 1) types are one of the following
per SAES-B-019, Table 1 (See Excel Sh # 2 Attached):
A) Portable hand held type
extinguishers (4 types)
• Pressurized Water 9.5 L Class A (SAMS 21-104-550).
• CO2 with nonmetal horn 4.5 Kg Type BC (21-102-223).
• Dry Chemical 12.2 Kg Class BC (hydrocarbon plant) (21-
102-820).
• Multi-purpose Dry Chemical Class ABC (21-102-775). SAES-B-019,
A1
Para. 4.1
B) Wheeled cart type extinguisher (2 types)
• Dry Chem 68 Kg Type BC for hydrocarbon plants (21-106-650).
• CO2 with dual 23 kg (50 lb)
cylinders Type BC (21-106-690) C)
Twin agent Extinguishers (Unit Skid or trailer)

NFPA 10,
Manufacturer Instruction Manual directions (storage, handling &
A2
preservation) for Portable Fire Extinguishers is available.
Para 4.3

Storage areas are not exposed to direct sunlight or corrosive GI-1781.001-01,


A3
atmospheres or exceed 120°F. Para 6.2

B Inspection Interval checks (per Manufacturer Instructions)

Fire extinguisher shells/cylinders shall be hydrotested at intervals


not exceeding those specified in the GI-1781.001,
B1
Supplements 1781.001-01 and 1781.001-02 and as per industry Para 4.6
standard NFPA 10.

Skid mount or trailer type extinguishers are checked during storage:

A) Visual checks to determine physical condition of extinguishers.


Components are free of corrosion,
deterioration & damage. B) GI-1781.001,
B2
Visual check to determine if any leakage exists (gauges) Supplement 1, 2
C) Visual check of tire condition & pressure as
applicable D) Check of environment (no direct
sun, temperatures below 120°F)
Inspection tags are marked with date of the inspection.

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Nov-2017- REV. 2017.09.00 (Standards Cutoff - September 30, 2017) Rev. 2017.09.00 30-Sep-17

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Storage, Handling & Preservation of Portable Fire Protection
SAIC-B-2012 30-Nov-17 MECH-
Equipment
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Wheeled type extinguishers are checked during storage:
A) Visual checks to determine physical condition
of extinguishers. Components are free of
corrosion, deterioration & damage.
B) Visual check to determine if any leakage exists (gauges) GI-1781.001,
B3
C) Visual check of tire condition & Supplement 1, 2
pressure as applicable D) Check of
environment (no direct sun, temperatures below 120°F)
Inspection tags are marked with date
of the inspection.

NFPA 10,
Fire extinguishers or extinguishing agents (media) shall be located not
B4
more than 75 ft (22.9 m) of travel distance from the Class D hazard.
Para 6.5.2

C GI-1781.001 General Requirements before Service

New fire extinguishers are delivered to Local Fire Control Unit to be


inspected, commissioned, tagged, & numbered prior to service. GI-1781.001,
C1
Contractor checked equipment on receipt & coordinates the storage Para 5.12.1
& preservation needed with Local Fire Control Unit.
REMARKS:

NOTES: 1. Storage, Handling & Preservation for new fire extinguishers is agreed upon early in the project. Prior to entering service, all new
fire extinguishers must be delivered to Local Fire Control Unit to be inspected (per GI-1781 supplemental checklists), commissioned, tagged,
and numbered per GI-1781.001, Section 5.12.1 Contractor checks equipment & mat'ls before their delivery to Saudi Aramco.
Storage, handling, preservation, & mixing of any extinguishing agents is approved by SA Fire Control Unit.
REFERENCE DOCUMENTS:
1- Saudi Aramco GI-1781.001 -- Inspection, Test, and Maintenance of Fire Protection Equipment, 3 Jan 2009
2- SAES-B-019 -- Portable, Mobile and Special Fixed Firefighting Equipment, (22 July 2012)
3- NFPA 10 -- Standard for Portable Fire Extinguishers, 2013 Edition
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use